I have made final decisions on quite a list of things lately. Tile, paint, granite, floors, cabinets..... I mean after all that whats left? :) just kidding, still a TON of selections still left to make (lights, sink fixtures, exterior)
The trim guy is the main trade at work this week.
Doors, casings, baseboards and detail trim in master ceiling and dining room ceiling.....
There are signs of the tile guy as well as the master shower and tub surround have been semi prepped for tile.
 |
| Front shot 27Aug |
 |
| almost done w brick 27Aug |
 |
| Add caption |
 |
| the picnic table will live here |
 |
| DOORS! All interior doors have been hung! |
 |
| with casing/trim! |
 |
| Laundry- Dog room is there to the right, under the stairs :) |
 |
| footers for the double columns |
 |
| Entry door w all windows & trim |
 |
| home of my future kitchen and red island :) |
 |
| from the kitchen out through the garage. |
 |
| prepping for tile |
 |
| There she is. THE ceiling. |
 |
| column bases in progress |
 |
| not sure about the space between but there it is |