The tile guy is 90% done. He's only got backsplashes left and those cant be done until the cabinets and countertops are in.
They have patched and filled and prepped for 2nd coat of interior paint.
Cabinets will be in this week. That will be major.
 |
| not much change out front. columns need paint. |
 |
| tile to the ceiling |
 |
| floor tile in boys' bath |
 |
| the corrected master bath floor |
 |
| all done. |
 |
| neighbor across the street. same builder. |
Still to come.....
Cabinets
Floors
Lights/Fans
Exterior concrete
Landscaping
Turning the power on!
Touch ups & cleaning