Thursday, July 18, 2013

Progress 15JUN2013

roof and gables
Side shot to see the gables that will be accents to the front elevation
Front entry & covered porch (porch concrete will be placed later)
the 'dramatic' entry - craftman columns to come.... Front door at the center.
Beer frig cubbie in the garage, the dog bedroom will be open to the inside adjacent to the beer frig cubbie - shown sewer stack for future bathroom in bonus (to remain unfinished for now)
The back. Main covered patio shown, area between 2 gableswill also be covered. Patio concrete to be placed at a later date. That is Mason's window there on the right..... he has the best view of the pond :)
staright on pic to see how the driveway will be.
Radient Barrier material